The surface must be clean, dry, level, able to bear the load and suitable for preparation conditions as required. Dirt and adhesion-impairing substances must be removed and uneven or chipped surfaces smoothed out with suitable materials, e.g. Klebe- und ArmierungsMasse AM 195 or KlebeMasse KM 193.
Execution robot
TiefGrund D13 fixing primer should be applied undiluted with a paintbrush or brush in one or two passes until the surface is completely saturated. Avoid the formation of a shiny layer after drying.
After work or during long breaks, the tools must be rinsed with water. During work, the surface must be protected from precipitation, fog, strong wind and direct sunlight until the material is completely dry.