Apply QUARTZ PRIMER or tinted DECOR PRIMER on the prepared surface (fig. 1).
Mix the selected bases in one container and stir the product thoroughly. Apply the first layer of material using a spatula or a stainless steel plastering trowel by spreading the product evenly over the entire surface (fig. 2).
Apply the second layer of coating to create an original pattern after the complete drying (4-6 hours) by making alternating strokes in different directions. Gently smooth the surface by making multi-directional movements after 10-15 mins (fig. 4). That will enhance the sparkle of material.
It is recommended to ventilate the room after the complete drying of the coating.